Model NO.: JT
Weight: up to 1000kg
Closed: Open
Development: New Type
Serviceability: Common Use
Surface Treatment: Plastic Spray or Baked Paint Finishing
Color: as Required
Type of Company: Manufacturer
Loading Port: Nanjing
Delivery Time: 10-20 Days According to Quantity
ODM: Yes
OEM: Yes
Steel Type: Q235
Load: Heavy Duty
Trademark: Jintuo
Transport Package: Standard Export Package
Specification: SGS
Origin: China
HS Code: 730890000
Flow-Through Rack for Supermarket ShelfAdvantages:
1.space utilization is about 85%
2.suitable for substantial homogeneous goods .
3.pallet size should fit racks
Features:
1. Individual access to all pallets to full height of warehouse
2. Simple stock rotation achieved
3. Easy beam adjustment accommodates variable pallet heights
4. Compatible with many handling equipment styles
5. Conventional tolerance for floors when used to 10m high
6. Lower level pallets can be located on the floor (picking pallets)
7. Accessories available can accommodate every unit load type
Structure:
1. The racking is developed from the medium duty racking.
2. Aluminum or steel roller rail are equipped between a pair of beams per layer to form a slope of 3 degree, and under the fluency of gravity, first in first out of goods are realized.
3. It is convenient to access and suitable for such places as the two sides of the assembly lines, distribution centers, etc.
4. The height of the racking is normally lower than 2.5M and the loading capacity of each layer is 1000kg at the most.
For a quick price, please answer following questions:
1. the CAD drawing of the warehouse (if available)
2. size (Width, Depth, Height)
3. How many loads/levels
4. Quantity
5. Port of destination (for a CFR or CIF price basis)/ or FOB Nanjing
6. Loading capacity of each layer
Contact Information
Renny
Tel: 0086-025-85363177, 0086-15850660712
Fax: 0086-025-86109278
Â
Material: | High quality rolled steel |
Surface treatment: | Powder coating |
Color: | Selective |
Capacity: | 1000kg Max per level |
packing | Carton, bubble film, PE stretch smoothly or as client's suggestion |
Delivery time: | 10~30 days depending on order quantity |
Delivery port: | Shanghai |
Aluminum Gravity Casting always use the permanent moulding with the liquid aluminum pouring into the cavity by ladles or vessel.Most of None ferrous metal could be produced by this gravity casting process including aluminum alloy,zinc,Magnesium,copper alloy,brass.
The gravity casting process as below:
1.Heating the moulding
2.Spraying coat agent in cavity
3.Pouring the liquid metal into die
4.Aparting the moulding after cooling
5.Triming the casting parts
Gravity Die Casting,Aluminum Low Pressure Casting,Aluminum Permanent Casting,Aluminum Die Casting
Wuxi Zhenzhe Electric Power Technology Co.,Ltd , https://www.zhenzhecasting.com