Fuzhou Haixi Agricultural Technology Innovation Center Project

Project Name: Haixi Agricultural Science and Technology Innovation Center Project of Fuzhou City (March 2012 - March 2014, 200 million yuan)
Region: Fujian Progress: Engineering Design and Construction Period: March 2012 - March 2014 Major equipment: Cranes, fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation facilities, and lighting facilities.
Project Profile: The project is located at No. 2467, Wusi Road, Fuzhou, Fujian Province, to construct a 26-storey office building with a three-level basement with a total floor area of ​​approximately 108,463 square meters.
The total investment of the project is 200 million yuan.
Construction Unit: Fujian Academy of Agricultural Sciences Postal address: Room 2111, 21st Floor, Glad Tech Research Center, Wusi Road, Fuzhou, Fujian 3500003
Contact: Chen Yanghui Telephone / 83835176
Design Unit: 6th Floor, Phase 2, Kecheng Building, No. 121 Science Avenue, Kecheng City, Guangzhou, China 510663
Contact: Li Demin Telephone, 82199139
Related Developments: Tower Crane Infrastructure Project

Scrap Shear

Ecohydraulic scrap shears cut scrap metal into smaller pieces and help to separate different materials types, earning you more money from your scrap metals.
Alligator shears are ideal for waste materials recycling processing industries, scrap metal (iron, steel, steel pipe, etc.) cold shearing to different section forms of middle and small steel factories.
With operator safety uppermost in mind, our shears are equipped with blade guards and foot operated switches.

Metal Shear, Scrap Shear, Alligator Shear, Metal Cutting Machine, Metal Shearing Machine

Jiangyin Metallurgy Hydraulic Machinery Factory , https://www.eco-metalsrecycle.com