Conductive oil pump assembly process needs to be carried out gradually according to process requirements, to eliminate barbaric operations, a direct impact on the quality of heat-conducting oil pump products. Heat transfer oil pump is divided into cast steel heat transfer oil pump and stainless steel heat transfer oil pump has vertical heat transfer oil pump, the assembly sequence is roughly the same. Specific steps are as follows:
First, to the parts warehouse to receive the assembly heat transfer oil pump all the necessary accessories.
Second, heating the washing machine, all the thermal oil pump impeller, thermal oil pump bearing sleeve, thermal oil pump body, pump cover, gland, shaft cleaning.
Third, remove the heat pump accessories from the cleaning machine Clean the cotton yarn in order to take a clean, placed on the pump station, ready to assemble.
Fourth, the pump coupling mounted on the shaft of the heat pump shaft section.
Fifth, the heat pump head off the first seal into the heat-conducting oil pump gland, and the other from the pump shaft mounted on the pump shaft.
Sixth, the card spring along the shaft lock sleeve on the pump shaft and the card spring stuck in the gland seal after the first card spring groove, and then the first piece of bearing grease into the pump bearing body, Bearing row bearing position must be and bearing body position is correct, with a copper rod will be placed next to the pump bearing the first bearing body bearing bit. Do not force too hard, so as not to damage the bearings.
Seven, the spindle from the bearing wear into the bearing body, the sealing gland tightened on the bearing body.
Eight, the bearing body from the other end of the spindle into the second bearing, the same way with the sixth.
Nine, the retainer along the shaft into the card and stuck in the card next to the spring groove, adding a ring.
Ten, will be prepared to take the oil soaked in heat-conducting oil pump high-temperature carbon fiber packing seal into the bearing body, and take casing to be compacted.
Eleven, the heat pump oil pump body mounted on the pump body, the heat-conducting oil pump high temperature frame oil seal along the shaft into the heat pump cover, and a good pressure ring and lock the mother.
Twelve, the heat pump impeller mounted, and lock the lock mother.
Thirteen, the heat-conducting oil pump pump seal aluminum gasket into the pump body, the heat-conducting pump pump cover bearing bearing body stand upright and tighten the bolts.
Fourteen, the entire thermal oil pump assembly is completed.
First, to the parts warehouse to receive the assembly heat transfer oil pump all the necessary accessories.
Second, heating the washing machine, all the thermal oil pump impeller, thermal oil pump bearing sleeve, thermal oil pump body, pump cover, gland, shaft cleaning.
Third, remove the heat pump accessories from the cleaning machine Clean the cotton yarn in order to take a clean, placed on the pump station, ready to assemble.
Fourth, the pump coupling mounted on the shaft of the heat pump shaft section.
Fifth, the heat pump head off the first seal into the heat-conducting oil pump gland, and the other from the pump shaft mounted on the pump shaft.
Sixth, the card spring along the shaft lock sleeve on the pump shaft and the card spring stuck in the gland seal after the first card spring groove, and then the first piece of bearing grease into the pump bearing body, Bearing row bearing position must be and bearing body position is correct, with a copper rod will be placed next to the pump bearing the first bearing body bearing bit. Do not force too hard, so as not to damage the bearings.
Seven, the spindle from the bearing wear into the bearing body, the sealing gland tightened on the bearing body.
Eight, the bearing body from the other end of the spindle into the second bearing, the same way with the sixth.
Nine, the retainer along the shaft into the card and stuck in the card next to the spring groove, adding a ring.
Ten, will be prepared to take the oil soaked in heat-conducting oil pump high-temperature carbon fiber packing seal into the bearing body, and take casing to be compacted.
Eleven, the heat pump oil pump body mounted on the pump body, the heat-conducting oil pump high temperature frame oil seal along the shaft into the heat pump cover, and a good pressure ring and lock the mother.
Twelve, the heat pump impeller mounted, and lock the lock mother.
Thirteen, the heat-conducting oil pump pump seal aluminum gasket into the pump body, the heat-conducting pump pump cover bearing bearing body stand upright and tighten the bolts.
Fourteen, the entire thermal oil pump assembly is completed.