Model NO.: YC-pantiliner machine
Dimension(L*W*H): 12.5m*3.5m*2.8m
Weight: 20~30 Tons
Rate of Finished Products: More Than 97%
Rate of Open Successfull: Ymore Than 88%
Trademark: YC-sanitary liners machine
Transport Package: Antirust Oil/ PE Film Cover / Seaworthy Wooden Box
Specification: YC-sanitary pads machine
Origin: China
HS Code: 84418090
Always Thin Dailies Wrapped Liners making machine/panty shield machine
Main Function Features
1. Side-gather &Â lamination panty liner can be produced;
2. Touch screen is adopted for man machine conversation;
3. Servo adopted for main machine drive; PLC control;
4. Active unwinding and splicing units are adopted for raw material;
5. Auto detects &Â alarm for material exhausted; auto reject for waste caused by splicing;
6. Square supports are adopted for frame of rotary bodies &Â cutters;
7. Protective door is equipped.
Â
 Four kinds of pantiliner machine for you to choose | ||||
Part 1Â Â Parameter | ||||
Model | YC-HY400 | YC-HY600-FC | YC-HY600-HSV | YC-HY800-SV |
motor | step motor control | variable frequency motor control | semi-servo motor control | full-servo motor control |
automaticity | semi-automatic | full-automatic | full-automatic | full-automatic |
Name | Economic  type | Frequency  type | Semi servo  type | Full servo  type |
Automaticly | Semi-auto | Full auto | Full auto | Full auto |
Product size | 2 sizes classic thick & ultra thin wing & straight |
2 sizes classic thick & ultra thin wing & straight |
2 sizes classic thick & ultra thin wing & straight |
2 sizes classic thick & ultra thin wing & straight |
Design speed | 600pcs/min | 1000pcs/min | 1000pcs/min | 1200pcs/min |
Production speed | 400-500pcs/min | 700-800pcs/min | 700-800pcs/min | 900-1000pcs/min |
Power | 80 KW | 100 KW | 100 KW | 120KW |
Power supply | 380V, 50HZ, 3Â phase 5Â wire | 380V, 50HZ, 3Â phase 6Â wire | 380V, 50HZ, 3Â phase 7Â wire | 380V, 50HZ, 3Â phase 8Â wire |
Efficiency rate | >=85% | >=88% | >=88% | >=88% |
Rejection rate | <= 3%Â | <= 2% | <= 2% | <= 2% |
Machine weight | 35 Ton | 45 Ton | 45 Ton | 45 Ton |
Machine size | 18m *Â 3m *Â 3m | 20m *Â 3m *Â 3m | 20m *Â 3m *Â 3m | 20m *Â 3m *Â 3m |
Operating size | 21m *Â 3m *Â 3m | 23m *Â 7m *Â 5m | 23m *Â 7m *Â 5m | 23m *Â 7m *Â 5m |
Air pressure | 0.6-0.8MPA | 0.6-0.8MPA | 0.6-0.8MPA | 0.6-0.8MPA |
Machine color | Customlized | Customlized | Customlized | Customlized |
Machine direction | Customlized | Customlized | Customlized | Customlized |
Part 2Â Â Electric part | ||||
PLC | × | Mitsubishi / Simense | Mitsubishi / Simense | Mitsubishi / Simense |
Touch screen | × | Mitsubishi / Simense | Mitsubishi / Simense | Mitsubishi / Simense |
Unwinding of the raw material | Mechanical | Initiative | Initiative | Initiative |
Materials shaft stand | Machanical shaft stand | Pneumatic shaft stand | Pneumatic shaft stand | Pneumatic shaft stand |
Tension control system for raw material |
× | √ | √ | √ |
Unwinding motor | × | variable frequency motor | variable frequency motor | Servo motor |
Web guider | Manual | Auto | Auto | Auto |
Driving system | One main motor | Three main motors | Servo motor control independently |
Servo motor control independently |
Detective | Manual | Auto | Auto | Auto |
Materials splicing | Manual | Auto | Auto | Auto |
Safety door | Back | Back &Â Front | Back &Â Front | Back &Â Front |
Flat belts | China | Switzerland | Switzerland | Switzerland |
Timing belts | China | USA | USA | USA |
Bearing | China | Japan | Japan | Japan |
Â
     What can we do for you? | |
1 | Equipment within one year warranty from the date of installation on buyer's workshop, modifications made to the machine as requested by the buyer, the quality guarantee period is constant. |
2 | Equipment installation, debugging and training buyer's operating personnel. |
3 | Yichuan shall dispatch 3Â engineers to your factory, include mechanical engineers, electric engineers and glue applicator engineers. |
4 | Responsible for the use of raw materials for commissioning of the equipment at the Supplier's factory. |
5 | Buyer can send a people to Yichuan factory to learn the machine before delivered. |
Frequently Asked Question
Q:Are you a machine manufacture or trading company?
A: We are a machine manufacture of baby diaper machine, adult diaper machine, pull on diaper machine, sanitary napkin machine, panty liner machine,underpad machine, pet pad machine, breast pad machine and Underarm pad machine.
Â
Q: What is the delivery time for a set machine?
A: 120 days as a fastest delivery time. As a manufacture, we need time to make our machine perfect in every taspect.
Â
Q: What is your term of payment?
A:T/T is our first choice, L/C at sight is ok as well.
Â
Q: How long is the warranty period?
A: one year after the testing finished at the buyer's workshop.
Â
Q: Will you send the engineer to install machine and train our workers in our factory
A: of course. We will send engineer to installing and training. But the salary and accommodation of technician will be on the buyer' s side. you can sent your engineers to our
factory for training, we will offer accommodation.
Q: How long can IÂ get the machine?
we will begin to make your machine once we receive your 30% down payment.
around 4Â month, we will finish the produce and ask the buyer to check the machine and pay for the rest money.
about 10 days for packing the machine, arrangment of shipping and customs clearance.
some days for the shipping and some days for the customs clearance in the buyers country.
Finally, you can get the machine.
Raw materials that we can offer
Contact ways
Â
Company website: www.ycmachine.com.cn
Company name: Fujian Yichuan Automation Equipment Joint-stock Co., Ltd
Company address: No.18, JinXi 6Â th Road, BinJiang Industrial Zone, XiaMei Town, Quanzhou City Fujian
Car Prototype,Car Prototype Processing,Automobile Prototype,Car Model
ShenZhen Jakeconn Precision Technology Co., Ltd. , https://www.jkpmoulds.com