Model NO.: REMO-Chair 05
Runner: Hot Runner
Design Software: UG
Installation: Semi Fixed
Standard: DME
Customized: Customized
Mold Steel: P20,718,S136,etc
Mold Base: Lkm,Hasco,Self-Made,etc
Trademark: REMO
Specification: international
Origin: China
HS Code: 8480719090
Plastic Chair Mouldumbrella table &Chair Mold REMO type
As a professional plastic mould manufacturer in China, we are specialized in opening new molds for various of plastic products. Our mould quotation will be made in 1 day and sent to consumers for reference. Quantity of mould and delivery time will be guaranteed.
Name | Description |
 |
 |
||||
Products' infomation we need to make quotation | Clear Pics/material/size/weight/wall thickness/targetting quantity and etc. |
 |
 |
||||
Mould Material | 45#, 50#, P20, H13, 718, 2738, NAk80, S136, SKd61 etc |
 |
 |
||||
Mould Base | LKM, HASCO ect. |
 |
 |
||||
Cavity | Single/multi |
 |
 |
||||
Runner | Hot/cold |
 |
 |
||||
Mould Design | 3D/2D Drawing |
 |
 |
||||
Design Days | 3 days |
 |
 |
||||
Design Software | UG, PROE, CAD, CAE, CAM, CAXA ect |
 |
 |
||||
Plastic Material | PP, PC, PS, PE, PU, PVC, ABS, PMMA ect |
 |
 |
||||
Mould Life | 300, 000-3, 000, 000 shots |
 |
 |
||||
Injection System | Pin-point-gate |
 |
 |
||||
Polish System | Mirror Polish |
 |
 |
||||
Payment | 40% of Deposit by T/T, 60% of Balance by T/T |
 |
 |
||||
Delivery Time | 15-60days |
 |
 |
||||
Specification | Depends on customers requirements |
 |
 |
||||
Business Step | |||||||
1. R& D | We support customer R& D. Make the files or improve the design if you needed | ||||||
↓ ↓ ↓ | |||||||
2. Quotation Making | Mould Quotation will be finished in 1 day according to information we get | ||||||
↓ ↓ ↓ | |||||||
3. Negotiation | The quality, price, material, delivery time. payment item. ect | ||||||
↓ ↓ ↓ | |||||||
4. Mould Design | 3-5 days for mould and product 3D/2D drawing design | ||||||
↓ ↓ ↓ | |||||||
5. Mould | According to customers' request to build the mould. Before make the mould. we send mould design to customer approval first. Mould will be usually finished in 25-60 days | ||||||
↓ ↓ ↓ | |||||||
6. Mould Testing | When moulds are finished, we will test the moulds to check it satified consumers' needs. And we will send samples for consumers' reference. | ||||||
↓ ↓ ↓ | |||||||
7. Sample shoot | If the first sample come out is not satisfied customer. we modify the mould and until meet customers satisfactory | ||||||
 ↓ ↓ ↓ | |||||||
8. Delivery | Delivery goods by sea or by air, according customers requirement |
Coil Packing Line,Steel Coil High-Speed Production Machine,Automatic Steel Coil Packaging Machine,Steel Coil Strapping Intelligent Machine
Shenzhen Packway Technology Development Co., LTD , https://www.packwaymachines.com