List of main equipment for 2000t/d tin (tin-tungsten quartz vein) ore dressing plant

/ D 2000t tin (tin, tungsten quartz vein) ore processing plant major equipment list

Device name

specification

amount)

Remarks

Device name

specification

amount)

Jaw Crusher

PBF400×600

1

Coarse

Spiral classifier

FLG-500

1

Standard cone

P×B-1200

1

Broken

Jigging

1000×1000 down type

4

Short cone

P×B-1750

1

Finely broken

Jigging

Code type

10

Linear vibrating screen

SZZ 2 1500×5500

2

Trapezoidal jigging

1200×2000×3600

2

Self-centering vibrating screen

SZZ 2 1500×5500

2

Trapezoidal jigging

300×450

2

SZZ 2 1500×3000

4

Shaker

6-S

88

SZZ 2 1250×2500

4

Shaker

6-S

7

SZZ 2 900×2500

3

Single layer spring shaker

4

SZZ 2 900×1800

3

Table floating bed

6-S

9

SZZ 2 900×3600

1

Centrifuge

800800×600

10

SZZ 2 400×800

1

Thickener

TNB-18

1

Overflow type rod mill

MBY1500×3000

2

a section of grinding

Thickener

TNB-24

1

Overflow type rod mill

4

Medium mine

Thickener

TNZ-6

2

Lattice ball mill

MBY900×1800

1

Thickener

TNZ-3.6

3

Overflow type rod mill

MQG1200×2400

1

Magnetic separator

PC-2 double disc dry

1

ball milling

MBY900×1500

1

Electric separator

120120×1500

3

Spiral classifier

FLG-1500

1

Flotation machine

×JB-0.35

40

Spiral classifier

FLG-1200

2

Flotation machine

39 liters

30

Spiral classifier

FLG-750

Note: The above equipment selection is for reference only. The specific equipment specifications, models and quantities need to go through detailed beneficiation experiments, which can be determined according to the nature of the ore.