Maoming Petrochemical lifts equipment installation climax

Drying equipment

China Drying Network News Maoming Petrochemical Company 100,000 tons / year butadiene rubber plant came on-site news, the project set off a climax of equipment installation. The project is one of Maoming Petrochemical's equipment structural adjustment projects. It started construction in November 2011 and is scheduled to be completed by the end of October. The project will be completed and put into production by the end of this year. The project construction period is only 12 months, and the construction period of the same type of rubber equipment in China is generally about one and a half years. In order to ensure that the project was delivered on time, Maoming Petrochemical focused on the key points of difficulty and set off a climax of equipment installation. At present, the lifting of the tower equipment is completed, and 50% of the plastic tanks are manufactured and installed on site, and the polymerization preparation, the cabinet room, and the substation main body construction are completed, and the electric instrument installation is started.

Excavator Ripper

An excavator ripper is an attachment that is used with an excavator to break up hard materials such as rock, concrete, and asphalt. It is a heavy-duty tool that is designed to penetrate the earth's surface and rip through the toughest of materials. The ripper is typically made up of a large metal claw that is attached to the end of the excavator's arm. The claw is then used to dig into the ground and break up the material, making it easier to remove and transport. Excavator rippers are commonly used in construction, demolition, and mining operations.

Ripper Tooth For Excavator,Stump Ripper For Excavator,Root Ripper For Excavator,excavator Digger Ripper

CATSU Hydraulic Machinery Equipment Co.,Ltd , https://www.cattiltrotator.com